Contact us

Raimondi LRH 174
Luffing Jib (hydraulic)

Luffing Jib (hydraulic)
Raimondi LRH 174

Jib length
Max. Load at Radius
Jib Radius & Lift Capacity
Jib length:50m
Max. Load at Radius:30.0m x 5.0t
Jib Radius & Lift Capacity:26m x 5.00t | 35m x 4.07t | 40m x 3.34t | 45m x 2.76t | 50m x 2.25t
Jib length:45m
Max. Load at Radius:19.0m x 10.0t
Jib Radius & Lift Capacity:26m x 6.97t | 35m x 4.74t | 40m x 3.93t | 45m x 3.25t
Jib length:40m
Max. Load at Radius:20.0m x 10.0t
Jib Radius & Lift Capacity:26m x 7.43t | 35m x 5.09t | 40m x 34.18t
Jib length:35m
Max. Load at Radius:20.0m x 10.0t
Jib Radius & Lift Capacity:26m x 7.58t | 35m x 5.17t
Jib length:26m
Max. Load at Radius:21.0m x 10.0t
Jib Radius & Lift Capacity:26m x 7.87t
Minimum out of service radius: 10.0m (50m jib) | 10.0m (45m jib) | 10.0m (40m jib) | 10.0m (35m jib) | 11.0m (26m jib) Power requirement – mains: Crane with 45 kW hoist 110 kVA | Crane with 37 kW hoist 90 kVA Power requirement – generator: Crane with 45 kW hoist 200 kVA | Crane with 37 kW hoist 180 kVA Running current: Crane with 45 kW hoist 160 Amps | Crane with 37 kW hoist 135 Amps Surge on start up: Crane with 45 kW hoist 178 Amps | Crane with 37 kW hoist 153 Amps

Contact us about our cranes

  • This field is for validation purposes and should be left unchanged.

You might also be interested in

A massive thank you to you and the team at Bennetts for such a smooth install of the tower crane on Saturday. Everything that was planned out went without a problem. Great work with great people – thank you.
Ken AlboroughSenior Site Manager, Volker Fitzpatrick
Well done – a very smooth and quick dismantle of both the Raimondi MRT84 and Comedil CTT121 tower cranes at the Victory Pier site in Gillingham. Thank you.
Billy SymesSenior Site Manager, Berkeley Group Plc
It has been a pleasure to work with Bennetts and a welcoming change to deal with a crane supplier that delivered what was agreed and when. The operators where very good and the crane always worked.
Terry BensonProject Manager, Shaylor Group
I'd just like to pass on our thanks to the de-rigging team for a job well done. Our saddleback came down safely and quickly and I would like to say the lads are a credit to Bennetts and I will be more than happy to recommend you on any future projects.
Matthew SeversConstruction Manager, M+W UK
I’d like say how impressed I’ve been with the service from Clare and Doug in helping us set up our crane operations.
Adam PriceProject Manager, Beard Construction
Excellent communications and extremely helpful both from a cost and technical perspective.
Gary McLaughlinGroup Preconstruction Director, Toureen Contractors
It was great working with Bennetts. I hope to be using them again in the future.
Anthony McGreevyProject Manager, Boshers
Thanks for your support on the project and hopefully see you again on the next one.
Sam BiddulphISG plc
I would like to take this opportunity to express our thanks to a special bunch of guys who carried out a dismantle over a weekend – very professional and a pleasure to work with.
Dave FaunchSenior Site Manager, EcoWorld

News and views from Bennetts Cranes